The site is under renovation and changes are expected..

Previous Projects

# Project Title Client
1 Floresta Garderns - FG109 : Commercial & Residential Building : MEP Works G+3P+Amenities+15+2 Pent House Endeavour Trading & Contracting
2 Amiri Guard Buildings & Facilities -Simaisma - Fire Fighting, Plumbing, Drainage & Water Supply Works M/s. Al Ali Engineering
3 Construction & Upgradation Of E Ring Road (North/South Link) - MEP Works For Underpass Pumping Stations M/s. Daewoo E & C
4 Tamin Air Base - Chiller Yard : MEP Works M/s Bahadir Engineering
5 Fox Hills - C06 : 2B+G+M+6 Commercial & Residential Building - MEP Works M/s United Architects
6 Fox Hills - B03 : 2B+G+6 Commercial & Residential Building - MEP Works M/s United Architects
7 Fox Hills - D52 : B+G+4 Residential Building - MEP Works M/s. ICON Architects -Engineers
8 Fox Hills - D35 : B+G+4 Residential buildingMEPWorks M/s. ICON Architects-Engineers
9 Fox Hills - D44 :B+G+4 Residential building.MEP Works M/s. ICON Architects-Engineers
10 Ras Bu Fontas Special Economic Zone Manateq Air Cooled Chiller, AHUs, Chilled Water Pumps & Pipeline M/s Sacyr - UCC J.V
11 Gabbro Expansion Project - Messaid MEP Works including VRF Systems, Air Cooled Chillers, AHUs, Chilled Water Pumps & Pipeline Network. M/s Six Construct
12 Qatar Rail Temporary Ventilation System & Tunnel ELV Systems (Red Line, Green Line, Blue Line And Stabling Yard) M/s. Mitsubishi Heavy Industries LTD
13 Supply and installation of HVAC systems at Ministry of Interior Head Quarters Building M/s. TransGulf Trading & Contracting
14 Supply and installation of HVAC, Electrical, Fire Fighting at Mall of Qatar North Zone M/s. Denver Trading and Contracting
15 Supply and installation of HVAC systems at Qatar University new block M/s. Power Supply Trading and Contracting
16 Installation of Electrical & HVAC systems, at the Pearl Qatar VB 345 towers, from Levels 1- Level 10 M/s. MegaTech